Levain and schedule

Choose when the loaf should be ready. We count backwards.

When should the loaf be ready?

Cold proof overnight

More flavour, and a fixed plan

On

Levain

The dough needs 200 g of levain. The number comes from the calculator.

Feeding ratio

What stays in the jar

g

Room temperature

Starter
20 g
Flour
100 g
Water
100 g

Ready in about 8–10 hours at 24 °C.

Schedule

Ready Tuesday 12:00

  1. Monday

    08:00

    Feed the levain

    1:5:5 · ready in 8–10 hours

  2. 16:00

    Autolyse

    Flour and water rest · 30–60 min

  3. 16:45

    Mix in levain and salt

    10–20 min

  4. 17:15

    Stretch and fold

    4 rounds, every half hour

  5. 20:45

    Bulk fermentation is done

    When the dough is airy and has grown

  6. 21:00

    Shape the loaves

    20–30 min

  7. 21:30

    Into the fridge

    Cold proof 12–14 hours

  8. Tuesday

    10:25

    Turn on the oven

    Preheat with a pot for 45 min

  9. 11:10

    Bake the loaves

    40–50 min

  10. 12:00

    Done

    Let the loaf cool for 1 hour

The times are estimates. Watch the dough, not only the clock.